Viseu
Portugal
The twin to the Fundão plant, in terms of its management and capacity. The plant is one we also built and developed together with our local partner FPT, and we supplied the boiler, supervised ELECNOR (EPC contractor) in the execution contract and, after its construction, we performed the operation and maintenance through Magestop. Its output is the same— 120,000 MWh of renewable energy from forest biomass—which represents an annual consumption of around 28,000 homes.
Viseu by night
Aerial view of works
Furnace openings (detail)
Stack, gas cleaning system and boiler on the back