Linares Bioeléctrica Plant
Jaén, Spain
Project Description:
The SACYR Group, through IBERESE, commissioned us to supply a boiler that could function with olive-oil solid waste and forest waste. Our proposal was to create a robust design that would be able to operate with minimal O&M costs and above 100% BMCR. This plant is a good example of a circular economy, as the waste from the olive-oil industry is used to produce renewable energy. This approach was designed by ENSO's current design team.

Works

Biomass and boiler

Boiler hoisting

Steam blow cleaning operation before start up