Fundão
Portugal
This plant, the twin to the Viseu project, was carried out and developed by ENSO, together with FTP, our local partner. It produces 120,000 MWh of renewable energy from forest biomass and contributes to the consumption of around 28,000 homes. We supplied the boiler, supervised ELECNOR (EPC contractor) in the execution contract, and, once it was built, we performed the operation and maintenance through Magestop.
Boiler and biomass conveyors
Metal structure during construction
Fundão’s O&M team (part of)
Fundão by night